This form is required by the Kerala State Electricity Board (KSEB) to assess if your specific location (transformer capacity, line load, etc.) can handle a solar connection. You cannot proceed with installation without an approved feasibility report.
A KSEB sub-engineer will visit your premises. They check the physical space, roof stability, and the technical capacity of the local distribution transformer. Step 4: Issuance of Feasibility Certificate
Kerala, often called "God's Own Country," is rapidly becoming a leader in renewable energy. With rising electricity tariffs and increasing environmental awareness, thousands of households and businesses are switching to rooftop solar power. However, before you install a single panel, you need official permission from the . kseb solar feasibility application form download pdf
Register on the Soura portal using your consumer number and mobile number. Fill out the digital equivalent of the feasibility form.
| Problem | Solution | |---------|----------| | Cannot find PDF on KSEB site | Check under “Downloads” → “Forms for Consumers” , not under “Solar Tariff” | | Downloaded form looks old (pre-2022) | Verify with KSEB section office – older forms are still accepted if signed | | PDF not opening | Use Adobe Acrobat Reader – browser viewers may fail | This form is required by the Kerala State
Once the application is submitted, KSEB follows a strict timeline (usually 15-30 working days depending on capacity):
Purchase and install the solar panels and inverter through a KSEB-empanelled or certified solar vendor. They check the physical space, roof stability, and
Submit the physical form, documents, and fee receipt to your local KSEB Assistant Engineer (AE). Alternatively, if you use the online e-filing portal, upload the scanned copies directly. Step 4: Site Inspection
Do you plan to apply for the subsidy?